Title 089 · Title 89

Determining if a permit is required.

Citation: N.D. Admin. Code § 89-08-02-01

Section: 89-08-02-01

89-08-02-01. Determining if a permit is required. 1. The impounding capacity of a dam is calculated based upon the elevation at the top of dam. Storage below the existing adjacent ground surface is generally excluded from the capacity of a holding pond, lagoon, or dugout. 2. The area protected by a dike is calculated based upon the area protected as measured from the effective top of dike. 3. The diverting capacity of a diversion is calculated based upon the runoff from the National Oceanic and Atmospheric Administration Atlas 14 twenty-five year, twenty-four hour, precipitation event. 4. No construction can begin until a construction permit is obtained. History: Effective November 1, 1989; amended effective April 1, 2004; January 1, 2015; January 1, 2023; July 1, 2024. General Authority: NDCC 61-03-13 Law Implemented: NDCC 61-16.1-38